Graco 333282B important safety instructions Key

Models: 333282B

1 76
Download 76 pages 38.62 Kb
Page 27
Image 27

6.Connect a dedicated supply line for each color to the corresponding color valve fitting (C1, C2, etc.) on the outlet color valve stack. Connect the other end of each line to the corresponding color valve fitting on the remote color stack.

7.Connect a supply line from the outlet valve on the bottom of the remote color valve stack to inlet A on the remote mix manifold.

8.Connect the supply line for each catalyst to the corresponding catalyst valve fitting on the inlet catalyst valve stack.

9.Connect a supply line from the bottom fitting of the inlet catalyst valve stack to the inlet manifold of the material B dosing pump.

10.Connect a supply line from the outlet manifold of the material B dosing pump to the bottom fitting of the outlet catalyst valve stack.

11.Connect a dedicated supply line for each catalyst to the corresponding catalyst valve fitting on the outlet catalyst valve stack. Connect the other end of each line to the corresponding catalyst valve fitting on the remote catalyst valve stack.

NOTE: If your system uses more colors than catalysts, branch the catalyst line to connect it to each mix manifold. Install a check valve on each branch of the catalyst line.

NOTE: For ease of maintenance, install a ball valve at all fluid line tees.

12.Connect a supply line from the outlet valve of the remote catalyst valve stack to inlet B on the remote mix manifold.

Installation

13.Connect the static mixer to the outlet valve of the remote mix manifold.

14.Connect a fluid line from the static mixer to the automatic dispense device.

Figure 11 Color Change Connections (Non-Circulating System)

KEY

 

 

A

 

Air inlet

 

W

 

Seal weep and

 

 

lubrication port

S

 

Solvent fitting

C1

 

Color 1 fitting

C2

 

Color 2 fitting

 

 

 

333282B

27

Page 27
Image 27
Graco 333282B important safety instructions Key