Startup

Startup

1.Place suction tube and drain tube in grounded metal pail partially filled with flushing fluid. Attach ground wire to pail and to true earth ground.

PAINT

FLUSH

2. Turn prime valve down.

Turn pressure control to lowest pressure.

3. Set pump switch OFF.

6309408

Page 6
Image 6
Graco Inc 7900 Roof Rig manual Startup, Turn prime valve down Turn pressure control to lowest pressure, Set pump switch OFF