Graham Field lf 1031 user manual Installation of New Pump

Models: lf 1031

1 28
Download 28 pages 20.13 Kb
Page 21
Image 21

Installation of New Pump

Tools needed: two 9/16" wrenches

Info: The hardware to attach the Hydraulic Pump (GF #1010S005) to the LF1031 mast and boom comes with the lift frame.

mast

attach new pump to lower mast

detail — attach new pump to lower mast

boom

upper boom

bracket

attach new pump

to upper boom

1.Attach the bottom of the new hydraulic pump to the lower mast bracket with the pressure knob and pump lever toward the bottom of the pump, as shown at above left, and the “FRONT” label toward you, as shown at above center. Use a hex bolt, washers, and hex nut to secure pump to mast. Use two 9/16" wrenches to tighten.

2.Attach the top of the hydraulic pump to the upper boom bracket, as shown at above right. Use a hex bolt, washers, and hex nut to secure pump to boom. Use two 9/16" wrenches to tighten.

WARNING: Ensure that the Hydraulic Pump is installed as described. If the Hydraulic Pump is not properly installed, personal injury and damage to the Hydraulic Pump could result.

LF1031-INS-LAB-RevD12

21

Page 21
Image 21
Graham Field lf 1031 user manual Installation of New Pump