![](/images/new-backgrounds/1076255/762559x1.webp)
Step 5 Install Supply Unit
Use a crane and a spreader bar hooked to the factory lifting lugs (as shown in the diagram) to lift and center the NV unit on the curb and equipment support. Use
Electrical and pipes connections can be made at this time.
Complete Installation
Illustration shows the complete installation of downblast NV with filter section and weatherhood.
Lifting Lugs
(4 places)
Model TSU Supply Unit
5