Reference
Start-Up Checklist
Unit Model Number ________________________________
(e.g.
Unit Serial Number ________________________________
| (e.g. 04c99999 or 10111000) |
________________________________ | |
________________________________ | |
Phone Number | ________________________________ |
Pre
oCheck tightness of all factory wiring connections
oVerify control wiring wire gauge
o
oVerify supply voltage to the main disconnect
oVerify the supply gas pressure
oVerify remote controls wiring
o Check line voltage | |
| |
|
oCheck blower rotation
oCheck for vibration
o Supply fan RPM | __________ | RPM |
o Motor nameplate amps | __________ | Amps |
o Actual motor amps | __________ | Amps |
o Actual CFM delivered | __________ | CFM |
Optional Accessories – refer to Blower
oHeating Inlet Air Sensor
_________ Actual Setting
Typical setting 60º-70ºF
oCheck supply gas pressure
_________ Maximum
_________ Minimum
_________ Actual
oCheck Pilot Gas Pressure
_________ Actual Setting Typical 3.0 inch wc
oSet optional High Gas Pressure Switch
_________ Actual Setting Typical 8.0 inch wc
oSet optional Low Gas Pressure Switch
_________ Actual Setting Typical 3.0 inch wc
oSet Burner Pressure Differential
_________ Actual Setting Typical 0.65 inch wc
oSet the maximum firing rate
_________ temp rise
oSet the minimum firing rate
_________ check
oSet the unit’s operating temperature
_________ ºF
Model VSU
®