67

Chapter 5

Installing the BCM1000

This chapter describes how to install the BCM1000.

Preparation checklist

Before you install the base unit, complete the following actions.

Determine the location for the BCM1000, telephones, and other equipment based on spacing and electrical requirements. For more information about spacing and electrical requirements, refer to the “Environment checklist” on page 67 and the “Electrical requirements” on page 68.

Order the required trunks from the central office.

Ensure that you have all the equipment and supplies you require to install the system. Refer to “System equipment and supplies” on page 69.

If you want to install the media bay modules into the BCM1000 before you install it, ensure that the DIP switches are set correctly. Refer to Chapter 4, “Selecting the media bay modules for your system,” on page 57 and Chapter 8, “Installing media bay modules,” on page 107.

Environment checklist

The installation area must be:

minimum of 4 m (13 ft) from equipment such as photocopiers, electrical motors and other equipment that produces electromagnetic, radio frequency and electrostatic interference

within 1.5 m (5 ft.) of a three-wire grounded electrical outlet

clean, free of traffic and excess dust, dry and well ventilated

within the temperature ranges of 0°C and 40°C (32°F and 95°F)

between 20% and 80% non-condensing relative humidity

enough space and strength to support the BCM1000

minimum of 46 cm (18 in.) from the floor

Note: The installation area must be of sufficient height from the floor to prevent water damage.

Installation and Maintenance Guide

Page 93
Image 93
Nortel Networks manual Chapter Installing the BCM1000, Preparation checklist, Environment checklist