Chapter 8 Installing media bay modules 111

Reconnecting the equipment

After you install the module correctly into the bay, you must return the equipment to operation in an orderly way.

Follow these steps carefully to ensure that you return your system to operation without endangering the equipment or yourself.

1Plug the power cords for the BCM1000 and the BCM1000e, if there is one, back into the ac outlets.

Note: The Business Communications Manager system starts up when you connect the ac power cord. System startup takes several minutes to complete.

2Connect the cables to the proper outlets on the media bay modules and the MSC on the server.

Caution: DECT modules

If you have a DECT module on your system: Plug the base station RJ45 cables into the DECT module one at a time. Ensure each base station begins the startup sequence before plugging in the next module.

3Check that the LEDs on the modules are on and static. Refer to “Checking system power and status” on page 117 for a detailed description of the LED states.

4Test existing functions to confirm their operation.

5Configure the module. Refer to the Business Communications Manager Programming Operations Guide for details.

Installation and Maintenance Guide

Page 137
Image 137
Nortel Networks BCM1000 manual Reconnecting the equipment