Preparing hardware for maintenance or upgrades

When you need to replace or update a piece of hardware on the Business Communications system, you must ensure the system is safely disconnected from the trunk lines and all electrical connections are disconnected. To replace interior components on these units, you can remove the top to access the inside of the units. Also, if you are replacing any of the PCI cards (base unit only) or any of the media bay modules, you may need to remove the front bezel of the unit.

Figure 73 provides an overview of the process for preparing the Business Communications Manager hardware for maintenance or upgrade procedures.

Figure 73 Process Map: Preparing the units for maintenance

Use Unified

 

 

Manager to

 

 

shut down

 

 

software

 

 

Disconnect cables

Remove the top

Restore power

from the front of

from the unit

to the units

the BCM1000 and

 

 

BCM1000e

 

 

 

Perform

Reconnect

Remove ac power

maintenance/

cables to the

plugs from both

upgrade

front of the units

units

procedure

 

 

 

 

 

Test system

Remove from rack

 

functions

 

 

or wall.

 

 

Place on

 

 

static-free surface

 

 

Special tools

Before you replace the components, ensure you have the following equipment:

Phillips screwdriver #2, with a blade 3.5 in. long

3/16 inch slot screwdriver

antistatic grounding strap

Caution: You must wear an antistatic grounding strap at all times when handling electronic components. Failure to do so can result in damage to the equipment.

Installation and Maintenance Guide

Page 193
Image 193
Nortel Networks BCM1000 manual Chapter Preparing hardware for maintenance or upgrades, Special tools