Grindmaster P400ESHP instruction manual Grindmaster Corporation, RAP400E, RAPS300E, RAPS400E

Models: P400ESHP

1 36
Download 36 pages 41.73 Kb
Page 1
Image 1
Shuttle Brewer & Airpot/Shuttle Brewers

Shuttle Brewer & Airpot/Shuttle Brewers

Operation and Instruction Manual

For Models P300E, P400E, P400ESHP, RAP300E,
RAP400E, RAPS300E, RAPS400E

Table of Contents

Installation and Start-up

1-2

Warning Labels

3

Operation

4

Adjustments

5-8

Care and Cleaning

...............................................

9-10

Service

10-11

Troubleshooting

 

 

Filling Problems

12

Heating

Problems

13

Brewing

Problems

14

Parts Illustrations

 

 

Models P300E & P400E

15

Model P400ESHP

16

Model RAP400E

17

Model RAPS400E

18

VSB-400

19

Shuttle CS-LL

20

Rough-In Drawings

 

Model P300

21

Model P400 & P400ESHP

22

Model RAP300

23

Model RAP400

24

Model RAPS300

25

Model RAPS400

26

VSB-300

..................................................

27

VSB-400

................................................

28

Wiring Diagrams

 

 

P300E/P400E with 1 Batch Timer

29

P300E/P400E with 2 Batch Timer

30

RAP300E/RAP400E

31

RAPS300E/RAPS400E

32

P400ESHP

33

Drawing

#091-548

34

Drawing #091-182

35

Installation:

￿WARNING

ELECTRIC SHOCK HAZARD!

Installation of this appliance should be performed by qualified service personnel only. Improper installation could result in electrocution.

See rough-in drawings in this manual for dimensions and locations of electric and water input.

Set-Up/Position

1)Remove the brewer from the packing material and attach its legs.

2)Position the brewer on a strong, stable table or counter. Check the level front to back and side to side. Adjust the legs to the cor- rect level.

IMPORTANT:

THE PERSON INSTALLING THIS APPLIANCE IS RESPONSIBLE FOR ENSURING THAT ELECTRIC AND WATER CONNECTIONS MEET THE REQUIREMENTS OF THE NATIONAL ELECTRIC CODE, NATIONAL PLUMBING CODE, AND ANY LOCAL ORDINANCES.

The electric and water hook-up locations are behind the front panel. Remove the four screws fastening this panel for access to these connections.

Water Hook-up

1)The water line may enter through holes on the rear or the bottom of the brewer. Use the right hand opening for water.

2)Use 3/8" copper or flexible water line to prevent strain. Do not use low temperature plastic tubing. The connection to the fill valve is 3/8" flare.

3)Water line pressure must be from 30 to 70 psi.

4)Hot (up to 160°F) or cold water may be used. Hot water offers faster recovery between brews.

5)Install a shut-off valve near the brewer.

6)Installing a filtering system can improve the taste of brewed coffee and extend the life of the brewer. If your water has high calcium (lime), chlorine, or iron content, this is especially important. The filter should be the lime inhibiting type if cold water is used. Contact your local water treatment professional regarding the type of filter you should use based on water quality and volume of water used.

Prior authorization must be obtained from Grindmaster Corporation for all warranty claims.

Grindmaster Corporation

4003 Collins Lane Louisville, KY 40245 USA (502) 425-4776

(800) 695-4500 (USA & Canada only)

(800) 568-5715 (Technical Service Only) FAX (502) 425-4664 www.grindmaster.com

© Grindmaster Corporation, 1998

0307 FORM # AM-309-08

PRINTED IN U.S.A.

Part # 090-077

Page 1
Image 1
Grindmaster P400ESHP instruction manual Grindmaster Corporation, Shuttle Brewer & Airpot/Shuttle Brewers, Installation