Grizzly G0513X, G0514X3 Clean Up, Site Considerations, Floor Load, Working Clearances

Models: G0513X

1 76
Download 76 pages 22.06 Kb
Page 21
Image 21
Clean Up

Clean Up

The unpainted surfaces are coated with a waxy oil to protect them from corrosion during ship- ment. Remove this protective coating with a sol- vent cleaner or citrus-based degreaser such as Grizzly’s G7895 Degreaser. To clean thoroughly, some parts may need to be removed. For opti- mum performance from your machine, make sure you clean all moving parts or sliding contact surfaces that are coated. Avoid chlo- rine-based solvents, such as acetone or brake parts cleaner, as they may damage painted sur- faces should they come in contact. Always follow the manufacturer’s instructions when using any type of cleaning product.

Gasoline and petroleum products have low flash points and could cause an explosion or fire if used to clean machinery. DO NOT use gasoline or petroleum products to clean the machinery.

Many of the solvents commonly used to clean machinery can be toxic when inhaled or ingest- ed. Lack of ventilation while using these sol- vents could cause seri- ous personal health risks or fire. Take precautions from this hazard by only using cleaning solvents in a well ventilated area.

Site Considerations

Floor Load

Refer to the Machine Data Sheet for the weight and footprint specifications of your machine. Some floors may require additional reinforcement to support both the machine and operator.

Working Clearances

Consider existing and anticipated needs, size of material to be processed through each machine, and space for auxiliary stands, work tables or other machinery when establishing a location for your new machine. See Figures 9 & 10 for the minimum working clearances.

���

���

Figure 9. G0513X minimum working clearances.

���

���

Figure 10. G0514X and G0514X3 minimum

working clearances.

G0513X/G0514X/G0514X3 Extreme Series Bandsaw

-19-

Page 21
Image 21
Grizzly G0513X, G0514X3 owner manual Clean Up, Site Considerations, Floor Load, Working Clearances