INSTALLATION MANUALFOR OUTDOOR UNIT

4.Refrigerant piping

(1)Outline piping

Flare connection

Indoor unit

(2) Piping size

Liquid pipe

9.52x0.8mm

Gas pipe

15.88x1.0mm

Liquid

3-way valve

pipe

 

 

Outdoor

 

unit

Gas pipe

3-way valve

 

 

Flare connection

Install the removed flared nuts to the pipes to be connected, then flare the pipes.

90 + 0.5

(3)Limitations for one way piping length and vertical height difference. One way piping length: less than 15m.

Vertical height difference: Less than 5m.

Precautions for refrigerant piping

Do not twist or crush piping.

Be sure that no dust is mixed in piping.

Bend piping with as wide angle as possible.

Keep insulating both gas and liquid piping.

Check flare-connected area for gas leakage.

(4) Piping connection

Connecting method

Apply refrigerant oil at half union and flare nut.

To bend a pipe, give the roundness as large as possible not to crash the pipe.

When connecting pipe, hold the pipe centre to centre then screw nut on by hand, refer to Fig. Be careful not to let foreign matters, such as sands enter the pipe.

Forced fastening without centering may damage the threads and cause a gas leakage.

Pipe dia

Fastening torque

 

 

Liquid pipe 9.52mm(3/8")

42N.m

Gas pipe 15.88mm(5/8")

60N.m

13

Page 14
Image 14
Haier AD142AMBIA, AU142AFBIA Outline piping, Piping size, Precautions for refrigerant piping, Piping connection