Haier AD142AMBIA Check And Test Run, Other instruction, Set of the air sending of the fan motor

Models: AU142AFBIA AD142AMBIA

1 24
Download 24 pages 25.16 Kb
Page 24
Image 24
 CHECK AND TEST RUN

Other instruction CHECK AND TEST RUN

Other instruction

1.Set of the air sending of the fan motor

Before leaving factory, the rotation speed of fan motor has already been set at standard choice. When the indoor unit uses free air sending and not needing to connect with duct, the fan speed of indoor unit is set at standard choice. When the indoor unit needs to connect with duct, please according to the following figure shown to change the connection of the connector installed on the side of electric box.

Standard pressure

Middle pressure

(Before leaving factory)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

One side of the control box

One side of the control box

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Connector(White)

 

 

Connector(White)

 

 

 

 

(White)

 

 

 

(Red)

 

One side

 

of

 

Fan

 

motor

 

 

 

 

 

 

 

 

One side of Fan motor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Unit: Pa

The relative relation between fan speed and static pressure

Standard pressure

 

2. Cut and flaring method

0

 

Use pipe cutter to cut the pipe, the burrs must be removed.

Middle pressure

After inserting the flarer, perform flared nut.

 

50

 

 

 

 

A

Flarer

Flaring dimensions as follows:

Connent pipe

Pipe diameter

Dimension A (mm)

 

 

 

Liquid pipe

9.52mm (3/8'')

1.0-1.2

 

 

Gas pipe

15.88mm (5/8'')

1.4-2.2

Correct

 

 

Incorr

 

Slant

Broken

Burrs

Uncompleted

Too long

3.Configuration of power supply

1.Set of the air sending of the fan motor Air conditioner must use special power supply system (above 20A), and qualified electrician makes wiring and fixing according to wiring regulations specified in national standard.

2. Cut and flaring method In socket, exactly distinguish earth wire with neutral wire and it is wrong to connect them together.

After inserting the flarer, perform flared nut. A leakage breaker must be installed.

3.Configuration of power supply Parameters of power supply: H07RN-F 3G 2.5mm2

4.Installation check and test run Connection method is Y-connection .If the power cord is damaged, it must be replaced by professional people of manufacturer or its maintenance department or similar to avoid dangers.

4.Installation check and test run

Require customers to use air conditioner according to the operation manual.

The items checked during test run,please mark Manual background in

Is the wiring of indoor and outdoor unit secured firmly?

Manual backgroundManual background How about the thermal insulation of the pipe joint:

Manual backgroundManual background Is the electrical wiring between indoor and outdoor unit connected to the terminal block firmly?

Is the display on the control board (LCD) correct?

Manual backgroundManual background Cooling normal?

Does the indoor temperature regulator work normally?

Manual backgroundManual background Is the power supply voltage conformed to the electrical regulation?

23

No gas leakage on the pipe joint ?

Manual backgroundManual background Is the drainage hose arranged correct?

Manual backgroundManual background Is the earthing wire connected firmly?

Manual backgroundManual background Any noise?

Manual backgroundManual background For the power supply

1shall be connected to the live wire.

2shall be connected to the neutral wire. Manual background Shall be connected to the earth wire.

Page 24
Image 24
Haier AD142AMBIA Check And Test Run, Other instruction, Set of the air sending of the fan motor, Cut and flaring method