Refrigerant Metering Devices

1.Tubing should be cut square. Make sure it is round and free of burrs at the connecting ends. Clean the tubing to prevent contamination from entering the system.

2.Make sure that both refrigerant stop valves at the outdoor unit are closed.

3.Push the tubing into the fitting until it stops. This prevents flux from getting into the system. 4.Remove the cap and Schrader valve core from the service port to protect the valve seals. 5.Wrap a wet rag around the valve stub before brazing.

6.Braze the joints of interconnecting tubing. Flow dry nitrogen into the shutoff valve port and through the tubing while brazing.

7.After brazing quench with a wet rag to cool the joint. Reinstall the Schrader core in the valve, if removed for brazing.

8.Pressurize the lines to 150 psi maximum with dry nitrogen. Check for leaks at all joints with liquid detergent. If a leak is found, repair it after removing the nitrogen. Repeat the process and re-ckeck.

9.Do not purge the lines with refrigerant. Evacuate the lines and indoor coil.

Refrigerant Metering Devices

Replace the existing indoor unit fixed orifice with the orifice supplied with the outdoor unit. See table 4 for the fixed orifice size for each unit.

Table 4

Fixed orifice size

 

outdoor model

indoor model

orifice size

 

 

 

 

 

 

HC18D2VAR

HB2400VD1M20

057

 

 

 

 

 

 

 

 

 

 

 

HC24D2VAR

HB2400VD1M20

062

 

 

 

 

HC30D2VAR

HB3600VD1M22

071

HC36D2VAR

HB3600VD1M22

078

HC42D2VAR

HB4800VD1M22

083