Hearth and Home Technologies HUDBAY-FS owner manual Grille Installation, Brick Set Installation

Models: HUDBAY-FS

1 49
Download 49 pages 1.8 Kb
Page 29
Image 29

D. Grille Installation

Figure 8.5 Following instructions stated above, remove the door of appliance.

Remove the four screws (two at each end) holding the grille in place. Lift up to remove.

Install the new grille by reversing the removal instructions.

NOTE: Clean glass and gold or nickel plating with glass cleaner and a soft cloth, wiping off all fingerprints prior to first fire to prevent permanent staining.

Figure 8.7 To install the baffle, slide it in at an angle and rotate upward parallel with the firebox. Place baffle up against the heat exchangers in top of firebox. Holding against heat exchangers, slide baffle towards front of appliance.

E. Brick Set Installation

Pilot

Shield

Pilot Bracket

Figure 8.6 The pilot shield has to be removed to install or remove the brick refractory. Removal of the bracket requires removing two screws.

Figure 8.8 Keeping the baffle elevated with your free hand, put the right side brick into position. Rest the baffle on the right side brick.

Figure 8.9 Still holding the baffle in place, install the left brick into position.

10/08

Quadra-Fire • Hudson Bay • 7003-121 Rev. i

Page 29

Page 29
Image 29
Hearth and Home Technologies HUDBAY-FS owner manual Grille Installation, Brick Set Installation