. A complete Parts List is available at www.HobartWelders.com

8-5. Adjusting Engine Speed

5

4

3

1

Top View

2200 − 2300 rpm

(36.6 − 38.3 Hz)

3675 − 3750 rpm

(61.3 − 62.5 Hz)

2

After tuning engine, check engine speeds with a tachometer (see table). If necessary, adjust speeds as follows:

Start engine and run until warm. Turn Fine Control to 10.

Remove rear panel and air cleaner to access idle speed adjustments. Remove top cover to access weld/ power speed adjustments.

Idle Speed Adjustment

Move Engine Control switch to Run/Idle position.

1Throttle Solenoid

2Mounting Screws

3Idle Speed Screw

Loosen mounting screws. Adjust solenoid position so engine runs at idle speed. If necessary, back out idle speed screw so solenoid can be moved to correct position. Tight- en mounting screws. Be sure sole- noid linkage works smoothly.

Turn idle speed screw for fine ad- justments.

Weld/Power Speed Adjustment

Move Engine Control switch to Run position.

4Weld/Power Speed Adjustment Nut

5Lock Nut

Loosen lock nut. Turn adjustment nut until engine runs at weld/power speed. Tighten lock nut.

! Stop engine.

Reinstall air cleaner, rear panel, and top cover.

Tools Needed:

1/4, 3/8 in.

244 033-A / 244 034-A

OM-240 438 Page 37

Page 41
Image 41
Hobart Welding Products OM-240 438E manual Adjusting Engine Speed, Idle Speed Adjustment, Weld/Power Speed Adjustment