2-9. Placing Jumper Links

Check input voltage available at site.

1 Jumper Link Label

Move jumper links to match input voltage and label on unit.

1

Do not overtighten.

Single-Phase Models

 

 

 

 

 

 

 

 

200 VOLTS

 

230 VOLTS

 

 

460 VOLTS

 

 

 

 

L

L

L

L

 

L

L

 

 

 

 

 

 

 

 

S-083 566-C

 

 

Three-Phase Models

 

 

 

 

 

 

 

 

 

230 Volts

 

 

460 Volts

 

575 Volts

L1

L2

L3

 

L1

L2

L3

L1

L2

L3

S-094 120-B

Tools Needed:

3/8 in

Ref. ST-801 455

OM-279 Page 12

Page 16
Image 16
Hobart Welding Products OM-279 manual Placing Jumper Links