3-6. Volt-Ampere Curve
The
SECTION 4 – INSTALLATION
4-1. Installing Welding Generator
Movement
YDo not lift unit from end.
OR
Airflow Clearance
18in
(460 mm)
| 18 in |
18 in | (460 mm) |
(460 mm) |
| |
18 in | 18 in | |
(460 mm) | ||
(460 mm) | ||
|
YDo not weld on base. Weld- ing on base can cause fuel tank fire or explosion. Bolt unit down using holes pro- vided in base.
YAlways ground generator frame to vehicle frame to pre- vent electric shock and static electricity hazards.
1Generator Base
2Metal Vehicle Frame
3Equipment Grounding Terminal
4Grounding Cable
Use #10 AWG or larger insulated copper wire.
Location
OR
Grounding
1 | 3 |
|
GND/PE4
OR
| Electrically bond genera- |
|
| tor frame to vehicle frame |
|
2 | by | 2 |
YIf unit does not have GFCI re- ceptacles, use GFCI- protected extension cord.
install1 12/99 – Ref.