SERVICE INSTRUCTIONS
Bin Control Thermostat Replacement Procedure
To ensure proper operation, follow the instructions below:
1)Make a 40 mm (1.6”) diameter loop.
2)Locate the loop below the Thermostat Capillary (Bulb).
3)Manually bend the Capillary to keep it 15 mm (0.6”) forward from the through hole position on the Holder.
4)Turn up the end of the Capillary.
1)Make a 40 mm (1.6”) ID
2)Locate the
3)Manually bend the Capillary to keep it 15 mm (0.6”) forward from the through hole position on the Holder.
4)Turn up the end of the Capillary.
Through Hole | Holder | Bracket - Holder | |
Holder | |||
| Through Hole | ||
| Capillary (Bulb) |
| |
| End |
| |
Loop | 60 mm (2.4”) | Capillary (Bulb) | |
| 15 mm (0.6”) | End | |
40 mm (1.6”) DIA | Capillary (Bulb) | 15 mm (0.6”) | |
| 40 mm (1.6”) | Capillary (Bulb) | |
Bin Control Thermostat Assembly Details |
| ||
| Thermostat | A |
Cord Heater Flexible Tube
Silicone Tube | 150mm | ||
(5.9”) | |||
| |||
Silicone Tube | 210mm | (8.3”) | |
|
| ||
| Seal |
|
Capillary (Bulb)
DETAIL A
[NOTE]
1)Run Cord Heater along with Capillary of Thermostat and bind them tightly with Aluminum Tape (Form end to end of Cord Heater).
2)Do not overheat Flexible Tube during shrinking process.