Hoshizaki F-330BAH(-C) instruction manual Lift up the top insulation and unsnap the

Models: F-330BAH(-C)

1 17
Download 17 pages 23.51 Kb
Page 12
Image 12
6) Lift up the top insulation and unsnap the

6) Lift up the top insulation and unsnap the

Bin Control

bin control assembly. Lift the assembly up

Assembly

through the insulation and set it aside. See

 

Fig. 4.

 

7) Remove the top insulation.

8) Remove the thumbscrews attaching spout

(B) to the bin, then remove spout (B). See Fig. 5.

Top Insulation

9) Remove the thumbscrews attachingFig. 4 spout (A) and safety bracket (A) to the

evaporator assembly, then remove spout (A) and safety bracket (A). See Fig. 5.

10)Pour the cleaning solution over the extruding head until the evaporator assembly and the reservoir are full and the solution starts to overflow into the drain

pan.

Note: If there is excess scale on the

extruding head, fill the evaporator assembly and reservoir as described above, then use a clamp on the

 

 

reservoir hose between the reservoir

Spout (B)

 

and evaporator assembly to block

 

flow. Pour additional cleaning fluid

 

over the extruding head until the

 

evaporator assembly is completely

 

full.

 

11)Allow the icemaker to sit for about

10 minutes before operation. If you placed a clamp on the reservoir hose in step 10, remove it before operation.

Spout Packing (A)

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundThumbscrew

Safety Bracket (A)

Spout (A)

Extruding

Head

Evaporator

Assembly

Cylinder

Manual backgroundManual backgroundManual backgroundManual backgroundManual background Packing

Thumbscrew

Fig. 5

12)Replace all parts in their correct positions. Make sure safety bracket (A) is in position as illustrated in Fig. 7.

13)Plug the unit back in. Move the flush switch to the "ICE" position and move the power switch to the "ON" position. Replace the panels in their correct positions and allow the unit to make ice using the solution until it stops automatically.

Note: This unit is designed to start operating when the water reservoir is full.

14)Remove the front panel.

15)Move the flush switch to the "FLUSH" position to drain the remainder of the solution.

16)After the solution has drained, move the flush switch to the "ICE" position.

17)Replace the front panel in its correct position.

18)Open the water supply line shut-off valve to supply water to the reservoir.

12

Page 12
Image 12
Hoshizaki F-330BAH(-C) instruction manual Lift up the top insulation and unsnap the