Hoshizaki service manual HR24A Sequence Flow Chart, Startup, Cool Down Achieved, Defrost

Models: HR24A

1 39
Download 39 pages 40.2 Kb
Page 12
Image 12
HR24A Sequence Flow Chart

HR24A Sequence Flow Chart

 

 

 

1. Startup

 

2. Cool Down

 

 

 

3. Cool Down Achieved

 

 

 

 

4. Defrost

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Defrost icon turns on.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• If Comp run time

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• CTh cools to setpoint.

 

 

 

 

 

 

< 3 min., Comp icon

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

and Comp continue

 

 

 

 

 

 

 

 

 

 

 

 

Factory default is 39°F.

 

towarmsCTh4°F

setpointabove

 

 

until 3-min. Comp run

 

F4CTh° setpointabove

 

 

 

 

 

 

 

 

 

3-min. Comp run timer

 

 

 

timer terminates. Once

 

 

 

 

2-min. Comp delay.

 

3-min. Comp

 

 

 

terminates.

 

 

 

 

 

 

3-min. Comp run timer

 

 

 

 

 

 

 

 

2-min. Comp off timer

 

 

 

 

 

 

terminates, Comp

 

 

 

 

 

• Comp icon flashes

 

run timer starts.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

starts.

 

 

 

 

 

 

de‑energizes and defrost

 

 

 

 

 

during Comp delay.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

starts.

 

 

Power on

 

 

 

 

 

 

CTh in control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EvapFM energized EvapFM continues

 

EvapFM continues

 

 

 

 

EvapFM continues

30-min. DT terminates

 

 

 

 

 

 

 

 

 

 

Comp energized

 

Comp de-energized

 

 

 

 

Comp de-energized

6-hr. DT starts

2. Sequence Flow Chart

12

Setpoint Achieved

 

Energy Saving Mode

 

 

 

 

 

 

• Door must remain

 

• When Comp de-energized, EvapFM

 

closed for 20 min. after

 

 

setpoint achieved.

 

operates 1 min. on, 5 min. off.

 

 

 

 

20-Min. ESM Timer Starts

20-Min. ESM Timer Terminates

EvapFM continues

Comp cycles on and off as

Comp cycles on and off as

 

required by CTh

 

required by CTh

EvapFM energizes on and off

 

 

 

with Comp cycle

 

 

EvapFM when Comp de-energized:

 

 

 

1 min. on, 5 min. off

Door Switch activated (door open): 20-min. ESM Timer resets EvapFM energizes

Legend: Comp-compressorCTh-cabinet thermistor ESM-energy saving mode EvapFM-evaporator fan motor

DT-defrost timer

Note:

EvapFM de-energizes when door is open.

There is a Comp delay of 2 min. at startup.

There is a minimum Comp run time of 3 min.

There is a Comp delay of 2 min. after a power interruption.

To initiate manual defrost, press and hold the "+" button until the defrost icon turns on the display module.

Defrost lasts 30 min.

Page 12
Image 12
Hoshizaki service manual HR24A Sequence Flow Chart, Startup, Cool Down Achieved, Defrost, Energy Saving Mode