Hoshizaki KM-2000SRH3, KM2000SWF3, KM-2000SRF3, KM-2000SWH3 2nd Cycle and after with pump drain

Models: KM-2000SWH3 KM-2000SRF3 KM-2000SRH3 KM2000SWF3

1 56
Download 56 pages 4.31 Kb
Page 17
Image 17
2nd Cycle and after with pump drain

2nd Cycle and after with pump drain

[KM-2000SWF3, KM-2000SRF3, KM-2000SWH3 and KM-2000SRH3]

IMPORTANT

Freeze cycle time is limited to 60 minutes even if Float Switch does not open.

1.Float Switch opens and signals to complete freeze cycle.

Drain timer starts counting.

5.After the first 5 minutes in freeze cycle. Ready to complete freeze cycle when Float Switch circuit opens.

IMPORTANT

Board never accepts freeze completion signal within the first 5 minutes in freeze cycle.

2.Drain timer stops counting. Pump drain is completed

3. Thermistor reads 48° F. Defrost Timer starts counting.

IMPORTANT Water Valve opening is limited to 6 minutes.

4.Defrost Timer stops counting.

Defrost cycle is completed and freeze cycle starts.

IMPORTANT

1.Board never accepts defrost completion signal within the first 2 minutes in defrost cycle.

2.Defrost cycle time is limited to 20 minutes even if Defrost Timer does not stop counting.

17

Page 17
Image 17
Hoshizaki KM2000SWF3 2nd Cycle and after with pump drain, KM-2000SWF3, KM-2000SRF3, KM-2000SWH3 and KM-2000SRH3