Installing the Switch

Installation Procedures

2. Verify the Switch Passes Self Test

Before mounting the switch in its network location, you should first check that it is working properly by plugging it into a power source and verifying that it passes its self test.

1.Connect the adapter’s power cord to the power connector on the back of the switch, and then plug the AC power adapter into a nearby properly grounded electrical outlet. If the power adapter part number 5188-6700 is used; first plug the country specific power cord into the adapter, and then into the AC power source.

Connect power cord to the power connector

NoteCaution

The switch does not have a power switch. It is powered on when the AC power adapter is connected to the switch and to a power source.

Use only the AC power adapter and power cord

(if applicable), supplied with the switch. Use of other adapters or power cords, including those that came with other ProCurve Networking products, may result in damage to the equipment.

2-6