Index

A

about this guide 5

areas prone to lightning or power surges 20 assembly 28

assembly area 22

C

capacity limitations 7 clearance area 8

cold weather considerations 20 communication connections 18 connection portals 16 connections, additional 16 connections, facility 16

D

delivery considerations 28 dimensions 8

drainage 12

E

electrical power capacity 7 electrical system 14, 15 environmental considerations 20 environmental control system (ECS) 16 environmental risks 20

equipment, installation 22

F

facility connections 16 fire and safety 18 fire suppression 6 future expansions 10

G

grounding requirements 11

H

HP site preparation drawing package 21

humidifier 12, 17

I

installation 22 installation equipment 22

L

lifting layout and requirements 22 lightning protection 20

M

materials, piping 14 mechanical cooling capacity 7 modifications, FCC notice 32

O

other objects 24 overview 5

P

permit requirements 21 piping materials 14

power infrastructure installation 14 power surges 20

pre-delivery 28

preparing for assembly 28 project coordination 21

R

regulatory compliance identification numbers 32 regulatory compliance notices 32

regulatory compliance, HP POD 20c 5, 31

S

safety information 6, 32 security 6, 18 seismic activity 20

site assessment 6, 21, 25 site assessment checklist 25 site pad 8

Index 36