5. Transportation, installation

During transport, observe the high centre of gravity of the paper shredder!

Place the pallet with the shredder in its packaging on a smooth, level surface.

Observe the instructions for unpacking.

If you need to move the shredder through narrow doors, you can wait until it is at its final location before fitting the loading tray. Without the tray, the machine is only 880 mm wide.

The shredder may only be placed in dry rooms on a hard, level floor – not on carpets. The floor load on each roller is approximately 180 kg.

The machine must be connected to a power source which meets the specifications on the nameplate. Make sure the power cable is unobstructed and that nobody can tread on it

Place the table on the supports. Make sure the oil hose is not bent. Fasten the table above (1) to the frame.

1

Screw the table on with the hexagon bolts (1) also at the bottom of the frame and fasten to the supports with the bolts (3) and nuts (4).

1

3, 4

1

Mount the loading table onto the unit:

Remove screws (1) and (2) from the frame.

1

2

Fasten the supports to the frame with the screws (2).

22

Mount the oil hose onto the unit:

Guide the hose through the recesses in the table to the oiler and shorten the hose.

6