C2
OR
Pop out a wiring access slug.
C3 |
C4
5/8 | 5/8 | |
1/2 | ||
1/2 | ||
|
Slide the mounting rails into brackets. | Using the depth markings on the housing, position the |
| bottom edge of the housing so that it will be flush with the |
| sheetrock. |
C5C6
Mark position of screws by using holes as a template. | Drill a pilot hole at the TOP of each outline, AS SHOWN. |
10