A6

Vaya a la sección E – Instalación Final en la página 14.

Connect 6” duct and vent to the outside. Use duct tape to secure joints. If ducting does not fit securely, an adapter may need to be purchased.

Section B - New Construction – suspended between joists

B1

OR

Pop out a wiring access slug.

B2

Slide the mounting rails into brackets. Note the orientation

of of the outer ends of the rails.

B3

5/8

5/8

1/2

1/2

 

Position the correct depth mark at the bottom edge of the joist based upon the the thickness of your sheetrock.

43045-01 710/15/2009

Page 7
Image 7
Hunter Fan 82043 manual Section B New Construction suspended between joists, 43045-01 710/15/2009