Flake Ice Machines | Refrigeration System |
Remote models with sixty (60) foot lineset runs will need an additional fifteen (15) ounces of refrigerant added.
In some cases the complete refrigerant charge may not enter the refrigeration system. In those instances, close the gauge manifold high side valve and disconnect the manifold from the high side port.
When the icemaker is completely charged, secure the caps to the service ports and check to make sure the ports are not leaking refrigerant.
Reference Tables on Page A5.
Page F14