GEM0650/0956/1256 A/W |
|
Note: Removal of the auger, water seal, evaporator and gear motor must begin at the top of the assembly.
To Remove the Breaker Bearing Assembly:
1. Disconnect electrical power.
2. Remove panels.
3. Push back bail clamp and remove ice chute cover.
4. Unscrew and remove ice sweep.
5. Lift up and remove ice chute.
6. The breaker may be removed from the auger and evaporator without disturbing the auger. a. Unscrew breaker cover from breaker (Note: Left Hand Threads)
b. Unscrew auger stud from top of auger. (Fig. 1)
c. Unscrew four (4) Allen head cap screws holding breaker to evaporator. (Fig 2)
d. Lift up, and remove breaker/bearing assembly from auger and evaporator. (Fig 3)
7.Service the bearing. Check for rust, rough spots and damage.
a.The bearing is pressed into the breaker, to remove the bearing and replace it, an arbor press is needed.
b.Replace lower seals before installing new bearing in breaker. Note: Seals must be pressed in with a tool pushing against the outer edge only, they will not install by hand.
c.Replace parts as required.
d.Replace top seal and check the
8.Reverse to reassemble: Specific tools and materials are required to install properly.
a.Add food grade grease such as
b.Check the seal to shaft areas for cuts or rough spots, none are permitted.
Fig. 1 |
|
| Fig. 2 |
|
|
| Fig. 3 |
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
| Bearing |
|
|
|
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
| |
| Ice Sweep |
|
|
|
|
|
| Seals | |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Auger Stud
Breaker Cover
Page 26