Intel 100BASE-T4 manual Installing, Express Hub, Requirements

Models: 100BASE-T4

1 43
Download 43 pages 26.29 Kb
Page 12
Image 12

2

Installing the

Express Hub

Requirements

Rack installation

Standard 19-in. (48.26 cm.) EIA equipment rack

requirements

1.5 EIA rack-mount spaces available for each

 

hub

Table and shelf

Approximately 13.25-in. (33.66 cm.) by 19.25-in.

installation requirements

(48.90 cm.) area on a level tabletop or shelf

 

Support for at least 10 lbs. (4.5 kg.) per hub with

 

filler panels installed in expansion and media

 

adapter slots

 

Support for at least 12.3 lbs. (5.6 kg.) per hub

 

with an NMM and an uplink module installed

Temperature

Ambient temperature between 5° C and 40° C

 

(41° F and 104° F)

 

No nearby heat sources such as direct sunlight,

 

warm air exhausts, or heaters

Humidity

Between 5% and 85%, noncondensing

Ventilation

Minimum 2 in. (5.08 cm.) on all sides for cooling

 

and adequate airflow in room or wiring closet

Operating conditions

At least 6 ft. (1.83 m.) from nearest source of

 

electromagnetic noise (such as a photocopier)

Service access

Minimum 12 in. (30.48 cm.) front and rear for

 

AC disconnect, service access and maintenance

 

access

 

Front and rear clearance for cables and wiring

 

hardware such as punchdown blocks

Wiring hardware

Wiring hardware, such as punchdown blocks or

 

patch panels, in place before installing the hub

Power

Adequate power source within 6 ft. (1.83 m.)

9

Page 12
Image 12
Intel 100BASE-T4 manual Installing, Express Hub, Requirements