C H A P T E R 1 Intel Express 510T Switch

 

Positioning and Installing the Switch

Allow adequate ventilation

The switch contains two fans to air-cool the internal circuitry. The air

 

is drawn in from the left of the unit and expelled through the outlet

 

grills on the right side and the rear.

 

To ensure correct airflow, leave 100 mm (4 inches) free space on both

 

sides and behind the switch. Do not allow the intake or outlet grills to

 

become blocked.

On a desktop

To install the switch in a desktop environment:

 

1 Find the four rubber feet in the pack that contains the rack

 

mounting kit.

 

2 Remove the backing strip from each of the four feet.

 

3 Attach the four rubber feet to the underside of the switch (to

 

ensure that the switch stands firmly).

 

4 Place the switch on a stable, flat surface.

 

5 Ensure that the air intake (on the left) and fan outlets (on the

 

right side and rear) are not blocked.

 

Warning The switch’s lifetime and operational reliability can

 

be seriously degraded by inadequate cooling.

Rack requirements

Install the switch in a standard rack in accordance with IEC 297 (or

 

similar); if the minimum outside measurements of the rack are 600 x

 

600 mm (23.5 x 23.5 inches), you must allow 190 mm (7.5 inches) of

 

space at the rear.

Mounting kit

The switch is delivered with a kit to attach it to a standard 19-inch

 

equipment rack (with side support rails). The kit contains two mount-

 

ing brackets and four screws (for attaching the brackets to the sides

 

of the switch).

Tools required for

In addition to the mounting kit, you need the following items to

positioning in a rack

mount the switch in a rack:

 

Standard 19-inch rack with side support rails.

 

3 mm screwdriver.

7

Page 17
Image 17
Intel 510T manual Positioning and Installing the Switch