|
|
| 2 |
TO ASSEMBLE BAGGER |
|
|
|
| 2 | 1 | 3 |
|
| 11 | |
|
|
| |
|
|
| 11 |
|
|
| 12 |
3 |
|
|
|
• Feed top bagger frame tube (1) through loop (2) at the top |
| ||
of bagger fabric (leave loop segments on the ends loose). |
| ||
|
|
| 9 |
4 | 1 |
|
|
| 5 |
| |
6 |
|
| |
|
|
| |
• First, align two holes as shown on side of bagger frame |
| ||
upper weldment (4) with corresponding holes in top bagger | 10 | ||
frame tube (1). |
|
|
|
• Install two 1/4"- 20 x 1.25 carriage bolts (5) and secure with | • Lay bagger cover | ||
two 1/4" nuts (6). |
|
| |
|
| intact). | |
|
|
| |
1 |
|
| • Slide bagger handle insert (9) into depression on inside of |
|
| bagger cover. Make sure the two tabs at the top lock into | |
|
|
| place with the bagger cover. Teeth at the bottom of the |
|
|
| bagger handle insert should slide into place in between the |
5 |
|
| teeth on the bagger cover. |
| 4 | • Slide two square nuts (10) into the two square slots at the | |
|
| front of the bagger cover and two square nuts into the two | |
|
|
| square slots (one slot on each side) at the rear handle of the |
|
|
| bagger cover. |
|
| 6 | • Turn bagger assembly (3) |
|
| frame to holes in the bagger cover, making sure frame upper | |
|
|
| |
|
|
| weldment tubing is seated in plastic cradle in the bagger |
• Align two holes on opposite of bagger frame upper weldment | handle insert (9). | ||
(4) with corresponding holes in top bagger frame tube (1). | • Install four 1/4” hex bolts (11) | ||
• Install two 1/4"- 20 x 1.25 carriage bolts (5) and secure with | with four square nuts (10) and tighten until seated. | ||
two 1/4" nuts (6). |
|
| • Install two 1/4” screws (12) |
|
|
| at center of frame upper weldment. |
1 |
| 7 |
|
7 |
|
|
|
8 |
|
|
|
•Install two more carriage bolts (7) rearward on sides of top bagger frame tube, hand tightening nuts (8).
23