![REMOVAL FROM WINDOW](/images/new-backgrounds/44418/4441813x1.webp)
r_ INSTALL THE AIR CONDITIONER IN THE WINDOW
•Carefully lift the air conditioner and slide it into the open window. Make sure the bottom guide of the air conditioner drops into the notches created by the L brackets.
•When the air conditioner drops into the L brackets, the
air conditioner will be centered in window opening as shown in FIG. 7.
•While steadying the air conditioner, carefully bring the window sash down behind the upper guide of the air conditioner, as shown in FIG. 8.
;1 \
CENTER LINE FIG. 7
WINDOWFRAME
UPPERGUIDE
ABOUT I_"
BOTTOM
GUIDE
L BRACKET | FIG. 8 |
I SECURE THE GUIDE PANELS
Extend the guide panels (ITEM F) to fill the window opening using 4 screws (ITEM B) to secure them, as shown in FIG. 9.
BINSTALL THE FOAM SEAL AND SASH LOCK
• Cut the foam seal (ITEM E) to the window width. Stuff the foam seal between the lower and upper window sash to prevent air and insects from getting into the room, as shown in FIG. 9.
•Fasten the remaining L bracket on either side of the window using screw (ITEM A). See FIG. 9 inset. Installing this bracket prevents unit falling from window being raised
L BRACKET
FOAM SEAL (ITEM E)
FIG. 9
•Remove the screw on lower right side of cabinet.
•Use this screw to attach the support bracket(ITEM H) to the inner window sill as shown Fig. 10.
,ITEM B
FIG. 10
_IlF AIR CONDITIONER IS BLOCKED BY STORM WINDOW FRAME
•If storm window presents interference, fasten a 2" wide wood strip to the inner window sill across the full width of the sill. The wood strip should be thick enough to raise the height of the window sill so that the unit can be installed without interference from the the storm window frame. See FIG. 11.
Top of wood strip should be approximately 3/4" higher than the storm window frame to help condensation to drain properly to the outside.
•Install a second wood strip (approximately 6" long by 11/2"wide and same thickness as first strip) in the center of the outer sill flush against the back of the inner sill.
Screw the L brackets into this strip.
This will raise the L bracket as shown in FIG. 11.
WOOD STRIP MOUNTED | 1" MAX. |
| 3/4" |
| |
ON TOP OF INNER SILL |
|
| z | ||
|
|
| CLEARANCE T | ||
|
|
|
| WINDOW |
|
INNER |
|
|
| FRAME |
|
SILL | WOOD STRIP |
|
|
| |
|
|
| OUTER |
| |
|
|
| SILL |
| |
| FOR L BRACKET I | ! I\ | TSIDEFIG. 11 | ||
| INSIDE |
|
|
REMOVAL FROM WINDOW
Turn the air conditioner off, and disconnect the power cord. Remove the L bracket and the screws installed
through the top and bottom of the side panels, and save for reinstallation later. Close the side panels. Keeping a firm grip on the air conditioner, raise the sash, and carefully tilt the air conditioner away from you, to drain any condensate water. Lift the air conditioner from the window and remove the foam seal from between the windows.
•Airconditionerscoveredin thismanualposean
excessiveweighthazard.Twoor morepeopleare neededto moveandinstallthe unit.
To preventinjuryor strain,useproperliftingand carryingtechniqueswhenmovingunit.
•Whenhandlingthe airconditioner,becarefulto avoid cutsfromsharpmetalfinsonfrontand rearcoils.
•Makesure airconditionerdoesnotfall duringremoval.