[i!i !! :i :_!! :i :_ SECTION 2
HOW YOUR WATER SOFTENER WORKS
B. SOFT WATER SERVICE and REGENERATION
AUTOMATIC BYPASS
During the brining, brine rinse and backwash cycles
of regeneration, HARD water goes through the soft- ener valve and to the house pipes. If a faucet is opened, hard water is there for your needs. Howev- er, you should not use hot water, if possible, because the water heater will refill with hard water. The soft-
ener, as factory programmed, regenerates from 2:00 AM to about 4:00 AM, a time when not much water is used.
If you start your day earlier in the morning (prior ro 4:00 AM), you may want to change the recharge
starting time. Set the recharge time to 12:00 AM or
1:00 AM (page
opened.
ELECTRONICS
Two main parts of the softener's electronics are a WATER METER, and _ a COMPUTER.
WATER
ener valve outlet. As water flows through the meter,
it sends electric pulses to the computer. The com-
puter changes the pulses to a measure in gallons of water.
COMPUTER
faceplate timer circuit board. It is programmed to
know the softener's capacity (how many grains of
hardness minerals it will take out of the water before
a regeneration is needed). When starting the soften-
er, page 1- 4, you set it for the grains per gallon (gp g)
hardness | of | the | water. |
|
|
|
|
|
|
| |
To find | a regeneration | pattern | best | for your | needs, | ||||||
the | computer | uses: (1) water usage from the meter, | |||||||||
(2) | hardness | setting, | (3) | softener | capacity, |
| and | (4) | |||
time | since | the | last | regeneration. | The | computer | |||||
always | adjusts | this | pattern | to your water | using | ||||||
habits. | It works | toward | providing | you | with | soft |
water for the longest time and at the most efficient
salt usage. |
|
|
|
|
|
|
|
|
| ||
Softening | capacity | is used | as hard | water |
| goes | |||||
through | the | softener | and | hardness | minerals |
| are | ||||
removed. | When | the computer | determines | that | only | ||||||
enough | capacity | remains to provide | soft | water | up | to | |||||
the | next | regeneration | starting | time | (2:00 AM, | or | as | ||||
otherwise | set) | it will | schedule | a regeneration. |
| When | |||||
the | regeneration |
| begins, RECHARGE | NOW | flashes | ||||||
in | the display |
| during | the regeneration. |
|
|
|
|
|
Problems, Questions? Call 1- 800- 426- 9345 Kenmore Water Line