Kobe Range Hoods CH2736SQB Diameter Hole, Draw electrical wires through cabinet access opening

Models: CH2742SQB CH2736SQB CH2748SQB CH2730SQB

1 102
Download 102 pages 46.98 Kb
Page 10
Image 10
1" Diameter

2.Unscrew the six screws on the bottom casing. Remove the bottom casing or remove the baffle filters and spacers. If necessary, arrange the electrical wires to run through the 1” diameter hole on the top or the rear of the hood. Refer to Figure 5.

3.Using references on Table 1 and measurements on page 22 center the hood in place beneath the cabinet and flush with the front of the cabinet.

1" Diameter

Hole

Figure 4

Figure 5

4.Draw electrical wires through cabinet access opening.

5.Place screw (not provided) into the exact center of each knockout hole. Make sure all screws are in place before tightening screws. CAUTION: MAKE SURE THE HOOD IS SECURE BEFORE RELEASING.

Ductwork Installation

6.Use aluminum or steel pipe to connect the plastic exhaust on the hood to the ductwork above. Use duct tape to make all joints secure and air tight.

8

Page 10
Image 10
Kobe Range Hoods CH2736SQB Diameter Hole, Draw electrical wires through cabinet access opening, Ductwork Installation