WALL MOUNT INSTALLATION – REAR VENT

***This installation only applied with the purchase of a duct cover (Model No. CH1120DC).

Preparation before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING.

-Decide the location of the venting pipe from the hood to the outside. Refer to Figure 21.

-A straight, short venting run will allow the hood to perform more efficiently.

-Try to avoid as many transitions, elbows, and long run as possible. This may reduce the performance of the hood.

-Use duct tape to seal the joints between pipe sections.

-If necessary, prepare back wall frame with cross framing lumber for secure installation. Using references on Table 2 and measurements on page 22-23, decide the level of the lumber. Refer to Figure 22.

-

Hood Preparation before Installation

-Temporarily wire the hood to test for proper operation before installing.

-Peel protective film off the hood and the duct cover (if any).

-Remove the screws on the vent cover (rear) and cut along the line of the inner vent cover (rear) opening. Refer to Figure 23.

-Cut the vent cover (rear) opening and reverse to the other side. Refer to Figure 24.

Figure 21

Inner Vent

Cover (Rear)

Figure 22

Reversed

Vent Cover

(Rear)

Figure 23

Figure 24

14

Page 16
Image 16
Kobe Range Hoods CH2730SQB, CH2748SQB, CH2736SQB, CH2742SQB installation instructions Wall Mount Installation Rear Vent