-If necessary, attach two rubber stands (provided) with two (4x8 mm) screws (provided) to the back of the hood.
-Attach the
Hood Installation
CAUTION: If required to move the cooking range to install the hood, turn off the power on an electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS RANGE.
1.Using references on Table 2 and measurements on page
Mounting
Screws
Figure 16 | Figure 17 |
2.Align
Duct Cover Installation
3.Mark the position of the duct
4.Use aluminum or steel pipe to connect the plastic exhaust on the hood to the ductwork above. Use duct tape to make all joints secure and air tight.
5.Connect electrical wires. Refer to “Wiring to Power Supply” on page 16.
6.Slide the inner duct cover up 2 inches before sliding the entire duct cover onto the hood. Refer to Figure 19.
12