8. INSTALLATION REQUIREMENTS

A. TOOLS REQUIRED

B. MATERIALS REQUIRED

S

Conventional woodworking tools

S

Plumbers putty

S Arc pliers or 14” pipe wrench

S

Water-resistant sealer

S

Rule

S Wall coverings, as necessary

S

Level

S

RTV silicone sealant

S

Safety shoes

S

Four 1/4” x 1” lag screws

SSafety glasses

SSquare

SScrewdriver

SPliers

SUtility knife

C. CLEARANCE REQUIREMENTS

Check roughing-in and room dimensions in order to provide adequate available space for the bath unit.

D.NEW OR REPLACEMENT INSTALLATION REQUIREMENTS

This bath unit can be installed in new or existing bathrooms.

For new installations: Position plumbing according to roughing-in dimensions beginning on page 5. Cap supplies and check for leaks.

For replacement installations: Remove old bath, remove old wall material and remove old floor covering from area. Remove old plumbing which does not conform to roughing-in requirements.

106548-CA(9437)

12

Kohler Co., Kohler WI

Page 12
Image 12
Kohler K-1201-AC, K-1215-AC, K-1200-AC Installation Requirements, Tools Required Materials Required, Clearance Requirements