Assembly
Supply unit for lamp housing 106Z with 50W
1.On/off switch
2.
3.Selector for L1/L2 burners
4.Fuse
5.Selector for 50Hz/60Hz
6. | Connector for lamp | 2 |
7. | Power cable |
|
The supply unit is intended for power supplies above 220V..
To run it on lower voltages a
Observe the safety regulations on page 5.
▶Connect the cable from the lamp housing to the supply unit
▶Engage “L1” or “L2” in accordance with the inscription
on the burner socket (see page 12)
▶Engage 50Hz or 60Hz
▶Connect the power cable to the supply unit and to the grid
▶Make a note of the
Supply unit for lamp housing 106Z with 100W
1.On/off switch
2.Pilot lamp LAMP
3.Pilot lamp TEMP
4.
5.Pilot lamp SAFETY
3 4 5
1 | 6 | 7 |
Input type 220V/240V ±10% 220V ~50/60Hz Hg50W L1/L2 Osram no..
1 | 4 | 2 | 5 |
3
Observe the safety regulations on page 5
▶Connect the cable from the lamp housing to the supply unit
▶Secure the lamp cable..
▶Connect the power cable to the supply unit and to the grid
▶Make a note of the
14
Type | ebq 100dc |
Input voltage | 90V to 250V AC, max 265VA |
Input frequency | 48Hz to 63 Hz |
Protection class | IP20 |
Series no.. | G 34240090 |
Fuses
The fuse holder is secured in the holder with spring clips on both sides..
▶Insert a screwdriver behind the spring clips and extract the fuse holder..
▶Insert the fuses (2⋅ T3,15A H250V F1/F2).
▶Refit the fuse holder