Lennox Hearth LSBV-4228MN Framing Specifications, Assembly Steps, Pre-Installationnotes

Models: LSBV-3628MP-H LSBV-4228EN-H LSBV-3628MN-H LSBV-3628MN LSBV-4228EN LSBV-4228MN-H LSBV-4228MP LSBV-3628EN LSBV-3628MP LSBV-4228MN LSBV-4228MP-H LSBV-3628EN-H

1 16
Download 16 pages 14.71 Kb
Page 5
Image 5
FRAMING SPECIFICATIONS

FRAMING SPECIFICATIONS

 

 

 

 

 

 

Back Wall of Chase/Enclosure

 

 

 

 

Including Finishing Materials

FOAK-4

 

 

 

 

if any

Combustion

 

 

 

 

 

Air Kit

 

 

 

 

D

 

 

 

 

 

K

F

 

 

 

 

 

 

 

 

 

 

G

 

 

 

 

C

 

 

 

Header

 

A

 

 

 

 

 

 

 

 

 

 

E

Rough

 

 

 

 

 

Framing Face

 

 

 

 

 

(Unfinished Shown)

 

 

 

 

Corner Installation

 

B

 

Figure 7

 

 

 

 

 

 

 

 

 

 

 

Framing Dimensions

 

A

 

 

Fireplace Opening Width

Fireplace Framing

 

 

 

 

Figure 4

 

 

 

LSBV-3628

LSBV-4228

 

 

 

42-1/4"

48-1/4"

 

 

 

A

 

 

 

(1073 mm)

(1226 mm)

 

 

 

 

Back Wall of Chase/Enclosure

FOAK

B

52-1/2"

52-1/2"

(1344 mm)

(1344 mm)

 

Including Finising Materials

Combustion

 

 

 

if any

 

Air Kit

C

23-9/16"

29-9/16"

 

C

 

(599 mm)

(751 mm)

 

 

 

 

 

 

D

11-1/4"

14-1/4"

 

 

 

(286 mm)

(362 mm)

G

 

 

 

 

 

 

63-1/2"

69-1/2"

 

 

 

E

 

 

 

(1613 mm)

(1765 mm)

 

 

 

 

H

A

H

F

31-3/4"

34-3/4"

(807 mm)

(883 mm)

Rough

 

 

 

 

 

Framing Face

Inside Chase

 

20-1/2"

20-1/2"

(Unfinished Shown)

G

 

 

 

(521 mm)

(521 mm)

Figure 5

 

 

 

 

 

H

4"

4"

 

 

 

 

 

 

(102 mm)

(102 mm)

 

 

 

 

 

 

 

J

7-1/2"

7-1/2"

 

 

 

(190 mm)

(190 mm)

Back Wall of Chase/Enclosure

 

 

 

 

44-3/16"

49-1/8"

Including Finishing Materials

Optional Locations

K

if any

 

(1122 mm)

(1248 mm)

 

C

 

 

 

FOAK

 

 

 

 

 

 

 

 

 

 

Combustion

 

 

 

 

 

Air Kit

Note: All framing dimensions calcu-

G

 

J

lated for 1/2" dry wall at the appliance

 

FATO Adapter

face. If sheathing the chase or finish-

 

(Optional)

 

ing with other thickness materials, cal-

 

A

 

 

 

culations will need to be made.

 

 

Rough Framing Face

 

 

 

 

 

 

 

(Unfinished Shown)

 

 

 

 

Outside Chase

 

 

 

 

Figure 6

 

 

 

 

 

NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.

ASSEMBLY STEPS

The typical sequence of installation follows, however, each installation is unique resulting in variations to those described.

1.Construct the appliance framing.

2.Route gas supply line to appliance location.

3.Position the appliance.

4.Install the vent system and exterior termina- tion.

5.Field wire and install operating control switch.

6.Make connection to gas supply.

7.Install (optional) outside Air Kit.

8.Install the logs and rockwool.

9.Checkout appliance operation.

10.Adjust burner to ensure proper flame ap- pearance.

PRE-INSTALLATION NOTES

The fireplace may be installed directly on a combustible floor or raised on a platform of an appropriate height. Do not place fireplace on carpeting, vinyl or other soft floor coverings. It may, however, be placed on flat wood, ply- wood, particle board or other hard surfaces. Be sure fireplace rests on a solid continuous floor or platform with appropriate framing for sup- port and so that no cold air can enter the room from under the fireplace.

The fireplace may be positioned and then the framing built around it, or the framing may be constructed and the fireplace positioned into the opening.

Usually, no special floor support is needed for the fireplace, however, to be certain:

1.Estimate the total weight of the fireplace system and surround materials such as brick, stone, etc., to be installed.

2.Measure the square footage of the floor space to be occupied by the system, surrounds and hearth extensions.

3.Note the floor construction, i.e. 2 x 6’s, 2 x 8’s or 2 x 10’s, single or double joists, type and thickness of floor boards.

5

Page 5
Image 5
Lennox Hearth LSBV-4228MN Framing Specifications, Assembly Steps, Pre-Installationnotes, culations will need to be made