NOTICE

PLACING UNIT ON SLAB

When installing unit at grade level, the top of the slab should be high enough above grade so that water from higher ground will not collect around the unit. The slab should have a slope tolerance as described in figure 5, detail B.

ROOF MOUNTING

Install the unit at a minimum of 4 inches (102 mm) above the surface of the roof. Ensure the weight of the unit is properly distributed over roof joists and rafters. Redwood or steel supports are recommended.

NOTICE

Roof Damage!

This system contains both refrigerant and oil. Some rubber roofing material may absorb oil and cause the rubber to swell when it comes into contact with oil. The rubber will then bubble and could cause leaks. Protect the roof surface to avoid exposure to refrigerant and oil during service and installation. Failure to follow this notice could result in damage to roof surface.

Removing and Installing Louvers

WARNING

To prevent personal injury, or damage to panels, unit or structure, be sure to observe the following:

While installing or servicing this unit, carefully stow all removed panels out of the way, so that the panels will not cause injury to personnel, nor cause damage to objects or structures nearby, nor will the panels be subjected to damage (e.g., being bent or scratched).

While handling or stowing the panels, consider any weather conditions, especially windy conditions, that may cause panels to be blown around and battered.

When removing the unit panels. Remove panel A first, then B, C and finally D. When reinstalling panels, reverse that order starting with panel D, C, B and finally A.

PANEL B

PANEL C

REMOVAL

STEP 1

TO REMOVE PANEL,

REMOVE MOUNTING

SCREWS SECURING

PANEL TO THE UNIT.

PANEL A

STEP 2

SLIGHTLY LIFT PANEL A IN

ORDER TO CLEAR SIDE

LIPS OF PANEL FROM

BASE OF UNIT.

STEP 3

TILT PANEL OUT SLIGHTLY

AND PULL DOWNWARD

TO REMOVE.

REPEAT STEPS 1, 2 AND 3 TO REMOVE PANELS B, C AND FINALLY D.

PANEL A

Removing and Installing LouversREMOVALINSTALLATIONManual backgroundManual background WARNING

PANEL A

INSTALLATION

STEP 1

STARTING WITH PANEL D,

TOP CAP

 

INSERT PANEL UNDER UNIT

 

TOP CAP LIP AND LIFT

 

SLIGHTLY TO CLEAR SIDE LIP

 

OF PANEL FROM BASE.

 

STEP 2

MOVE PANEL IN TOWARDS UNIT.

ALIGN LEFT/RIGHT SIDE LIPS OF

PANEL WITH GROOVE INSERTS

ALONG LEFT/RIGHT SIDE OF UNIT.

SIDE

GROOVE

STEP 3

SECURE PANEL, WITH

MOUNTING SCREWS.

REPEAT STEPS 1 AND 2 TO

 

INSTALL PANELS C, B AND

BASE

FINALLY A.

 

PANEL D

PANEL D