START-UP AND PERFORMANCE CHECK LIST
Job Name:___________________ | Job No.:_______________________ | Date:_________________________ | |
Job Location:_________________ | City:__________________________ | State/Province:_________________ | |
Installer:_____________________ | City:__________________________ | State/Province:_________________ | |
Unit Model No.:_______________ | Serial No.:_____________________ | Service Technician:______________ | |
Electrical Connections Tight?______________________ | Flue Connections Tight?__________________________ | ||
Supply Voltage_________________________________ | Unit Operation Checked?__________________________ | ||
Gas Piping Connections Tight & Leak Tested?________ | THERMOSTAT |
| |
Motor Amps___________________________________ | Calibrated?___________________________________ | ||
Unit BTU Input________________________________ | Heat Anticipator Properly Set?___________________ | ||
Line Pressure__________________________________ | Level?_______________________________________ | ||
Manifold Pressure___________________in. w. c. |
|
|
45, 60, and 75 UNIT DIMENSIONS
MOUNTING SLOTS (Typical) 5/16 x 3 Inches (8 x 76 mm)
DIMENSION | 45 | 60/75 | |
|
|
| |
A | 12 (305) | 17 (432) | |
B | |||
C | (260 | ||
D | (83) | ||
E |
B
|
| 13 | 13 |
|
|
| (330) | (330) |
|
| HANGING | 7 |
| |
| (184) | (178) |
| |
| BRACKETS |
| ||
| 3 | 1 | ||
| (2) | |||
(83) |
|
| (76) | (25) |
|
|
|
| 1/2 |
|
|
|
| (13) |
|
|
| AIR |
|
|
|
| FLOW |
|
|
|
|
| |
|
|
|
| (470) |
|
|
| HEAT |
|
|
|
| EXCHANGER |
|
|
|
|
| 1 |
|
|
|
| (25) |
|
| |
| (470) |
|
| HANGING |
|
BRACKETS (2) |
| |
| SITE |
|
| GLASS | THUMB |
ADJUSTABLE | SCREW | |
LOUVERS | SIDE VIEW |
|
|
|
TOP VIEW
|
| 26 |
|
| (660) |
| |
GAS | (146) |
|
|
INLET |
|
|
|
ELECTRICAL |
|
|
|
BOX (60, 75) |
|
|
|
FLUE |
|
|
|
OUTLET |
|
|
|
|
| C |
|
E |
|
|
|
| D | COMBUSTION AIR |
|
| ELECTRICAL | INLET | DIRECT |
|
| ||
|
| DRIVE FAN | |
| BOX (45) | BACK VIEW | |
|
|
1
(25)
A