Lennox International Inc installation instructions XC21 Start−Up and Performance Checklist

Models: Dave Lennox Signature Collection XC21 System XC21

1 19
Download 19 pages 52.21 Kb
Page 18
Image 18
XC21 Start−Up and Performance Checklist

XC21 Start−Up and Performance Checklist

Customer

 

 

 

 

 

 

 

Address

 

 

 

 

 

Indoor Unit Model

 

 

 

 

 

 

 

Serial

 

 

 

 

 

Outdoor Unit Model

 

 

 

 

 

 

 

Serial

 

 

 

 

 

Solar Module Mfg and Model

 

 

 

 

 

 

 

Serial

 

 

 

 

 

Notes:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

START−UP CHECKS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Refrigerant Type:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rated Load Amps

 

Actual Amps

 

 

 

Rated Volts

 

Actual Volts

 

Condenser Fan Full Load Amps

 

Actual Amps:

 

 

 

 

 

 

 

 

 

 

COOLING MODE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Vapor Pressure:

 

Liquid Pressure:

 

 

 

 

 

 

 

 

 

 

Supply Air Temperature:

 

Ambient Temperature:

 

 

 

Return Air Temperature:

 

HEATING MODE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Vapor Pressure:

 

Liquid Pressure:

 

 

 

 

 

 

 

 

 

 

Supply Air Temperature:

 

Ambient Temperature:

 

 

 

Return Air Temperature:

 

System Refrigerant Charge (Refer to manufacturer’s information on unit or installation instructions for required subcooling and approach temperatures.)

Subcooling:

 

 

 

 

Saturated Condensing Temperature (A)

A

B

=

SUBCOOLING

 

 

 

 

minus Liquid Line Temperature (B)

 

 

 

 

 

 

 

 

 

Approach:

 

 

 

 

Liquid Line Temperature (A)

A

B

=

APPROACH

 

 

 

 

minus Outdoor Air Temperature (B)

 

 

 

 

 

 

 

 

 

Indoor Coil Temp. Drop (18 to 22°F)

 

 

 

 

Return Air Temperature (A)

A

B

= COIL TEMP DROP

 

 

 

 

minus Supply Air Temperature (B)

Page 18

Page 18
Image 18
Lennox International Inc Dave Lennox Signature Collection XC21 System XC21 Start−Up and Performance Checklist