CLEARANCE FOR
HEATER SERVICE
INSTALLATION DATA
LG (L)(MAFD)
CONTROL | SAFETY |
23 of 33
CLEARANCE TO SERVICE WATER LEVEL PROBES
CLEARANCE HOLES
FOR ELECTRIC
SERVICE
2.75" DEPTH
CONTROL | SAFETY |
5 PSI
This drawing and all information therein are the property of
DRAWING TITLE: (INSTALLATION DATA) LG (L)(MAFD) | MODEL UNIT: LG |
|
| |||
DECRIPTIONS: | DRAWN BY: | CHRISTOPHER FERRARA |
|
| ||
HIGH PRESSURE | CHECKED: | SAL NEGRO |
|
| ||
MOTORIZED | ENGINEER: | - | - DWG NO.: | SCALE: N/A | ||
- | APPROVED: | JOHN PARDINI | SHEET: 1 OF 1 | |||
|