Liebherr HC 1011/1060, HC 1001/1050, 20707 Kitchen Cabinet Construction, Kitchen Cabinet Airflow

Models: 20707 7084000-01 HC 1001/1050 HC 1011/1060

1 14
Download 14 pages 14.28 Kb
Page 4
Image 4
Kitchen Cabinet Construction

Kitchen Cabinet Construction

u Screw in ball stud Fig. 3 (3) together with the soft stop mechanism Fig. 3 (2) in the fastening hole.

u Re-attach all covers Fig. 2 (5,6,7,8).

-The top ventilation space can be either directly over the appliance Fig. 4 (2) or next to the ceiling over a cabinet Fig. 4 (3), or through a vent installed in a soffit Fig. 4 (4).

4 Kitchen Cabinet Construction

This is a fully integrated appliance which means that it is fully enclosed by a kitchen cabinet. This type of cabinet must be carefully constructed using the proper dimensions and it must provide proper ventilation to ensure proper appliance operation.

Make a separate kitchen cabinet for each appliance for Side-by- Side installations.

Consider having a professional install the appliance in your kitchen cabinet.

4.1 Kitchen Cabinet Airflow

4 Kitchen Cabinet Construction Fig. 4

-There must be a ventilation space at least 31 in2 (200 cm2) at the airflow inlet Fig. 4 (1) and at the airflow outlet Fig. 4 (2).

4.1 Kitchen Cabinet Airflow Fig. 5

-There must be a clear ventilation space (without any obstructions) of at least 1-1/2 in. (38 mm) at the back of the kitchen cabinet.

Observe the above ventilation dimensions.u

Ventilation through the cabinet base at the bottom can be achieved by installing the provided ventilation grille Fig. 6 (3) or via a ventilation opening of at least 31 in2 (200 cm2). When using the provided ventilation grille Fig. 6 (3), please proceed as follows:

4

Page 4
Image 4
Liebherr HC 1011/1060, HC 1001/1050, 7084000-01, 20707 Kitchen Cabinet Construction, Kitchen Cabinet Airflow