Service Manual

 

 

 

 

1 Service (continued)

 

 

Sequence of operation

 

 

Table 1A Sequence of operation

 

 

 

 

 

OPERATION

 

DISPLAY

 

 

1. Upon a call for heat, the control turns on the water heater pump.

WHR: Standby

 

 

OUT: 123.8F(129)

2. The control connects 120 VAC to the blower. The blower does not

 

 

run at this time.

 

 

• If the unit is equipped with a flow switch, it must close before the

 

 

control powers up the blower.

 

 

• The manual reset high limit must be closed before the control

WHR: Standby

powers up the blower.

OUT: 123.8F(129)

• If the unit is equipped with a solenoid valve and/or a vent

valve, they will be energized along with the blower.

 

 

• If the unit is equipped with a gas pressure switch, it must close

 

 

at this time.

 

 

• If there is an auxiliary device connected to the unit, the unit

 

 

will then provide 24 VAC to its enable relay. If the auxiliary

 

 

device has a proving switch, it must close before the

 

 

sequence continues.

 

 

 

 

3. The control then starts a 10 second prepurge cycle.

WHR: PREPURGE

 

 

OUT: 123.9F(129)

4. Once the prepurge cycle is complete, and the blocked drain

WHR: IGNITION

switch is closed, the control starts the 5 second trial for ignition by

sending spark voltage to the spark electrode and opening the gas

OUT: 123.9F(129)

valve.

 

 

 

5. If the control does not detect flame by the end of the trial for

 

 

ignition, the control performs a 10 second postpurge, another

 

 

prepurge and tries to light the burner again.

WHR: POSTPURGE, PREPURGE

If the burner does not light after 4 trials on Models 150 - 399, the

control locks out for 1 hour and then tries another set of 4 trials.

OUT: 123.9F(129)

If the burner does not light after 1 retry on Models 500 - 800 the

 

 

control will lock out.

 

 

 

 

 

6. If the control detects a flame before the trial for ignition ends, it

WHR: WHR 20% RATE

begins to modulate the burner in order to maintain the set point.

 

 

OUT: 124.8F(129)

 

 

 

7. Once the call for heat is satisfied, the control will turn off the burner.

WHR: POSTPURGE

The blower will remain on for the 10 second postpurge cycle. The

water heater pump will continue to run for its pump delay time,

OUT: 127.4F(129)

then turn off.

 

 

8. Water heater pump off.

WHR: Standby

 

 

OUT: 124.7F(129)

9

Page 9
Image 9
Lochinvar 150 - 800 service manual Sequence of operation