Table of Contents | 3 |
General Information |
|
Introduction & Important Information | 2 |
Safety Precautions | 4 |
Features & Specifications | 6 |
Stove Installation |
|
Planning The Installation | 7 |
Floor Protection Requirements | 8 |
Stove Placement Requirements | 8 |
Clearances | 8 |
Chimney Requirements | 10 |
Chimney Termination Requirements | 11 |
Outside Air Requirements | 11 |
Alcove Installation Requirements | 12 |
Mobile Home Requirements | 13 |
INSTALLATION DIAGRAMS |
|
Standard Ceiling with a Factory Built Chimney | 14 |
Cathedral Ceiling with a Factory Built Chimney | 14 |
Exterior Factory Built Chimney | 15 |
Hearth Stove Positive Connection | 15 |
Hearth Stove Direct Connection | 16 |
Interior Masonry Chimney | 16 |
Operating Your Appliance |
|
Safety Notice | 17 |
Before Your First Fire | 17 |
Opening the Door | 17 |
Bypass Operation | 18 |
Starting a Fire | 19 |
Adjusting the Burn Rate | 20 |
Ash Removal | 20 |
Optional Blower Operation | 21 |
21 | |
Overnight Burn | 21 |
Normal Operating Sounds | 21 |
Hints for Burning | 22 |
Selecting Wood | 22 |
Troubleshooting | 23 |
Maintaining Your Appliance |
|
Daily Maintenance | 24 |
Remove Ash | 24 |
Clean The Glass | 24 |
Monthly Maintenance | 25 |
Door and Glass Inspection | 26 |
Check For Creosote Buildup | 25 |
Yearly Maintenance | 26 |
Touch Up Paint | 26 |
Blower Cleaning | 26 |
Firebrick and Baffle Inspection | 26 |
Door Parts | 27 |
Replacing the Glass | 27 |
Replacing the Door Gasket | 27 |
Replacing the Door Handle | 27 |
Firebox Parts | 28 |
Floor & Side Firebrick Removal & Replacement | 28 |
Baffle Removal and Replacement | 29 |
Air Tube Removal and Replacement | 29 |
Warranty |
|
Warranty | To |
Listing Information |
|
Listing Information | 31 |
Optional Equipment |
|
Door Shell Installation | 32 |
Stove Legs | 34 |
Pedestal | 35 |
Rear Blower Installation | 36 |
Outside Air Boot Installation | 37 |
Index |
|
Index | 38 |
© Travis Industries | 4040608 |