10 | Stove Installation (for qualified installers only) |
Zero-Clearance (Metal) Fireplace Requirements
•Must utilize a positive (full reline) or direct connection
•Must be manufactured by one of the following manufacturers:
• Marco • Majestic • Heatilator • Preway • Tempco • Superior
•Entire fireplace, including chimney, must be clean and undamaged. Any damage must be repaired prior to installation of the insert
•Entire fireplace, including chimney, must meet local building requirements
•Chimney height: 15' minimum; 33' maximum. Minimum cross section: 28.65 square inches
•The damper ("A") and grate ("B") must be removed (see Figure 4). The smoke shelf ("C"), internal baffles ("D"), screen ("E"), and metal or glass doors ("F") may be removed (if applicable). The masonry lining ("G"), insulation ("H"), and any structured rigid frame members (metal sides, floor, door frame, face of the fireplace, etc. – "I") may not be removed or altered
|
| H |
|
F |
| C | A |
|
| ||
|
|
| |
|
|
| D |
| E |
| I |
|
|
| |
|
|
| B |
|
|
| G |
Figure 4
Drafting Performance
This appliance relies upon natural draft to operate. External forces, such as wind, barometric pressure, topography, or factors of the home (negative pressure from exhaust fans, chimneys, air infiltration, etc.), may adversely affect draft. Travis Industries can not be responsible for external forces leading to less than optimal performance.
Leveling Bolt Installation
Two leveling bolts are included to level the insert if the fireplace has a
This distance is the |
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
| |||
hearth |
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
| |||
leveling bolts should |
|
|
|
|
|
|
|
|
| ||
stick out this far from the |
|
|
|
| Fireplace | ||||||
base of the insert. |
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
| |||
Hearth |
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The leveling bolts go
into the holes at the
rear corners of the
insert.
Figure 5
© Travis Industries | 4040806 |