Louisville Tin and Stove BBT54, BBT53, BBT103, BBT104 warranty Sequence Of Operation

Models: BBT103 BBT104 BBT54 BBT53

1 26
Download 26 pages 37.89 Kb
Page 15
Image 15
SEQUENCE OF OPERATION

SEQUENCE OF OPERATION

Thermostat calls for heat

â

Power to Draft

â

Pressure

â

(VentorInducerMotor)

Switch(Fan Proved)Closes

 

 

 

 

 

NO

â

Lockout

after 3

 

attempts

 

 

Spark Ignition

Energized

â

â

Gas control

valve opens gas flow to burner

â

15 Sec.

 

Ignition

â

Proved

NO

Heating Cycle

â

Thermostat satisfied

â

Gas control valve closes

â

20Sec.

Post Purge

Draft

inducer off

â

Stand-by mode

Page 15

STEP #

1)Thermostat calls for heat.

2)Inducer turns on.

3)Pressure switch closes.

4)Power to ignitor.

5)Gas flow to burner.

6)Burner ignition proven.

NOTE: If there is a malfunction in any of the above steps, the sequence will stop at that point and return to Step 2. If after 3 attempts malfunction still occurs, control will go into lockout mode for one hour. This one hour lockout can be bypassed by resetting the thermostat, or interrupting power.

7)Thermostat satisfied.

8)Gas valve closes.

9)Inducer turns off.

HEATER IS NOW IN STANDBY MODE.

Page 15
Image 15
Louisville Tin and Stove BBT54, BBT53, BBT103, BBT104 warranty Sequence Of Operation