Louisville Tin and Stove BBT104, BBT53, BBT103 Floor, Optional Kits, Installation, Step, Page

Models: BBT103 BBT104 BBT54 BBT53

1 26
Download 26 pages 37.89 Kb
Page 6
Image 6
OPTIONAL KITS

OPTIONAL KITS

For special installation applications and modifications, the following kits are available from your local dealer. To ensure safe, efficient operation of your Direct Vent Gas Baseboard be sure to use only authorized kits.

Table 1: Special adaptation and modification kits available for use with the Direct Vent Baseboard Heaters.

MODEL#

DESCRIPTION

CONTENTS

VWSK5/10

Vent Weather Seal Kit

2” diameter PVC pipe, external wall seal, O-ring, 2 PVC straps,

 

 

PVC glue, instructions.

 

 

 

VRK5/10

Vent Riser Kit

Wall mount plate, 21-1/2” stainless steel vent riser, instructions

 

 

 

SVCK5/10

Side Valve Concealer Kit

4” cabinet extension, wall plate, screws, instructions

 

 

 

BVCK5/10

Bottom Valve Concealer Kit

4” cover, wall plate, screws, instructions

 

 

 

 

 

 

 

INSTALLATION

WARNING:

Failure to follow these instructions carefully could result in poor performance, property damage,

 

personal injury, or loss of life.

STEP 1.

LOCATE VENT OPENING (Requires a 2-1/2” hole when not using vent weather seal kit).

a)

Select area on wall where heater will be installed.

b)

Check outside vent termination for proper clearances. See Figure 1.

c)

Locate studs behind heater location.

d)

Using template supplied, mark location for 2-1/2” hole between studs. See Figure 2.

e)

Cut vent openings through both the inside and outside walls, being sure to maintain level

 

across both openings.

 

 

 

VENT HOLE LOCATION FOR THE AIR

 

INTAKE AND EXHAUST TUBES FOR

 

STANDARD INSTALLATION 2-1/2” DIA.

 

HOLE. NOTE: 3” DIA. HOLE REQUIRED

 

FOR WEATHER SEAL KIT.

 

11-3/8”

7-3/4”

OF HEATER

 

RIGHT END

FLOOR

 

Page 6

FIGURE 2

Page 6
Image 6
Louisville Tin and Stove BBT104, BBT53, BBT103, BBT54 warranty Floor, Optional Kits, Installation, Step, Page