The State of Massachusetts requires that installation and service of a gas
appliance be performed by a plumber or gas fitter licensed in the
Commonwealth of Massachusetts.
CONTENTS
Introduction…………………………… | 2 | Wiring Diagram…………………………... | 14 |
Specifications and Dimensions………...….. | 2 | Removing Main Burner………………....… | 13 |
Safety Rules…………………………….. | 3 | Proper Burner Flame………………...…… | 13 |
Clearances………………………………. | 4, 5 | Sequence of Operation……………......…. | 15 |
Location………………………………… | 5 | Optional Kits………………………........16 - 20 | |
Installation………………………………. 6 - 10 | Trouble Shooting…………………..…... 21 - 22 | ||
Lighting Instructions……………………... | 11 | Parts Drawing………………………… | 23 |
Gas Conversion | 12 | Parts List……………………………… | 24 |
Burner Orifice………………………… | 13 | Warranty……………………………… | 26 |
INTRODUCTION
THIS IS A
SPECIFICATIONS AND DIMENSIONS
Your Direct Vent Wall Furnace is shipped complete in one carton. This carton contains the furnace, vent exhaust tube, air inlet tube, template with
| MODEL | INPUT |
|
|
| GAS | T Y P E | MAX. WALL | MIN. WALL |
| NO. | BTU/HR. | WIDTH | DEPTH | HEIGHT | CONN. | GAS | Thickness | Thickness |
|
|
|
|
|
|
|
|
|
|
| BBT53 | 5,000 BTU | 48” | 5.375” | 9.375” | 3/8” | NAT. | 16” | 4” |
|
| 1.45 KW | 122cm | 13.65cm | 23.8cm |
|
| 41cm | 10cm |
| BBT54 | 5,000 BTU | 48” | 5.375” | 9.375” | 3/8” | L.P. | 16” | 4” |
|
| 1.45 KW | 122cm | 13.65cm | 23.8cm |
|
| 41cm | 10cm |
| BBT103 | 9,000 BTU | 72” | 5.375” | 9.375” | 3/8” | NAT. | 16” | 4” |
|
| 2.61 KW | 183cm | 13.65cm | 23.8cm |
|
| 41cm | 10cm |
|
|
|
|
|
|
|
|
|
|
| BBT104 | 9,000 BTU | 72” | 5.375” | 9.375” | 3/8” | L.P. | 16” | 4” |
|
| 2.61 KW | 183cm | 13.65cm | 23.8cm |
|
| 41cm | 10cm |
|
|
|
|
|
|
|
|
|
|
Page 2